latests Projects
+150 MW
Of critical power delivered as specialists
+6000 hours
Delivered in the Sector
​
Versatile team
Of Digital Technologists and specialists
Clash Detection in Hyperscaler Data center
Clash detection of 15 diferent contractors in a 100 MW Data Center Project, As specialists EDT was defining the rules, matrix, processes and asignees of the recurrent clash detection during Design and Construction of the Data Center.
Dealing with GC, Contractors delays and exigent Client.
​
lod 300 modeling in madrid´s historic building
LOD 300 modeling of a refurbishment of historic building in Madrid´s City Center, CAD to BIM modeling, Drawing extraction and Data Populating in an historic building.
+100 Families created, Architecture and Structure disciplines, more than 130 drawings printed and recreation from CAD files.
Data Extraction in Schedules
bep documentation and guidelines for data center project
Documentation of a DataCenter project, BEP, MIDP, Revit Guidelines, Clash Detection Manual, for EMEA strategy future projects of an International client.
contractors Model and Drawings audit in data center project
Audit of models quality and Drawings quality automation and checklists for +100MW Data Center, during design phase in accordance with BEP was stablished some checklists for the quality of models and drawings, and some processes were defined for auditing the work of Contractors, extracting the Data of the files and giving back scores, scheduling meetings with time for remediation.
lod 350 civil modeling for hiperscaler data center
Technical service during the Pre-con and Construction phase for a Data Center of 80 MW of IT capacity.
Modeling of SW pipes, FW pipes, Fiber, LV, MV, ELV, Security ducts.... All underground services, opes and structure for Civil discipline.
Adding the information to the elements to be trackable during construction and producing Post IFC drawings .